Total Loss Settlement
Settle the total loss before it starts costing more.
Evidence based valuations, prompt agreement and salvage handled end to end.
Contact Us
- Pre-Accident Valuation
- Settlement Negotiation
- Salvage Management
- Hire and Storage Control
A TOTAL LOSS GETS MORE EXPENSIVE EVERY DAY
The cost of a total loss is mostly the delay.
Once a vehicle is beyond repair, the settlement figure is only part of the cost. Storage, recovery charges and replacement vehicle hire carry on until the claim is agreed. Moving quickly on a properly evidenced valuation is what keeps the total cost of the claim down. Run properly, the whole process can be completed in under two weeks. Every day beyond that is money, and credit hire companies profit from slow total loss processing. That is why claims are prioritised to procure all the analysis needed for a fair, comprehensive settlement in the shortest time possible.
01
Value
Pre-accident values triangulated via industry sources and local market data at loss date.
02
Negotiate
The figure is discussed and agreed with the owner or their representative.
03
Settle
Payment is made, salvage is collected and the claim is closed.
A NUMBER THAT STANDS UP
Valuation is evidence, not an opening position.
A settlement is accepted quickly when the figure is right and can be explained. We build valuations from comparable advertised vehicles, trade guides, mileage, condition and specification, and we share the basis of the figure with the owner rather than simply issuing a number.
01
Confirmation
The vehicle is confirmed as a total loss following engineering review.
02
Valuation
Market evidence is assembled, and a pre-accident value is set.
03
Offer
The figure and the basis for it are presented to the owner.
04
Closure
Settlement is paid, salvage is uplifted and hire is ended.
CONTROLLING WHAT SITS AROUND THE SETTLEMENT
Where total loss costs are won or lost.
01
Valuation Evidence
Comparables, guides and vehicle condition recorded behind every figure.
02
Salvage Return
Vehicles categorised via ABI Code to maximise return through targeted buyers.
03
Hire and Storage
Charges ended as soon as the loss is confirmed.
04
Documentation
V5, finance and lien positions resolved before settlement is paid.
A fair figure agreed quickly costs less than a low one argued over.
Our own claims platform carries the engineering decision, the valuation evidence and the settlement position on the same claim file, so total losses are agreed and closed without the file stalling. Nothing waits on someone else’s system, which is what stops hire and storage running on while a valuation is agreed.
01
Lower total claim cost
Hire and storage stopped early rather than late.
02
Faster agreement
Evidenced figures accepted first time more often.
03
Better salvage returns
Disposal managed rather than simply delegated.
04
Fewer disputes
Valuations explained rather than imposed.
get started
Start a conversation.
Whether you're reviewing your current repair network or evaluating future options, we'd welcome the opportunity to explore how we can help deliver faster resolutions and stronger outcomes.
Cookie Consent
We use cookies to improve your experience on our site. By using our site, you consent to cookies.
Cookie Preferences
Manage your cookie preferences below:
Essential cookies enable basic functions and are necessary for the proper function of the website.
You can find more information in our Cookie Policy and Privacy Policy.